THE WORK, EXPLAINED
Start with the condition.
Understand the scope.
Identify the required door arrangement and confirm which leaf will normally operate. Ask the provider to specify the frame, threshold, meeting-edge hardware and lockset, together with the removal and finishing scope. Have the proposal explain how alignment and the operation of both leaves will be checked and how additional opening repairs would be handled.
What may be involved
- prehung French door pair
- astragal
- hinges
- flush bolts
- lockset
- threshold
- flashing
- casing
Ask the provider to distinguish existing parts to inspect, proposed replacements, and tools, materials or reports included in the service. Confirm the work and exclusions after assessment; this list does not mean that every item will be supplied or replaced.
LOCAL RESEARCH / Monte Sereno
Planning your work
Monte Sereno states that the State Building Code requires permits any time a building or structure is erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished, and lists a small number of exemptions such as sheds under 120 square feet and fences up to 7 feet. Confirm the address, the proposed scope and which permits apply with the City of Monte Sereno before work starts. This reference concerns the City of Monte Sereno; it does not establish requirements for a neighbouring jurisdiction or for an individual property.
Source ↗Area-wide context does not establish the condition of your property or equipment.
Before the visit
Identify the affected opening and describe the symptom. Gather available product labels and previous work records. Explain access restrictions and keep the opening clear.
Service illustration · not a completed customer project

